IL-2 over Rock River in Rockton
Replacing two aging bridges over the Rock River required an innovative construction approach to overcome limited working space while maintaining traffic along this important transportation route.
- Location
- Winnebago County, IL
- Client
- IDOT- Region 2 / District 2
The multi-year project involved replacing two bridge structures using temporary crossovers to allow one bridge to close at a time. To create sufficient space for construction equipment, the contractor shifted one existing bridge approximately 37 feet, transforming it into a temporary work platform for construction of the new structures. This unconventional approach allowed work to proceed without installing a separate temporary bridge or tramway.
- Construction
- 2024-2026
- Construction Cost
- $26M
Bloom provided construction engineering services, including daily on-site inspection, materials testing, geotechnical inspections, construction layout verification, project documentation, and administration of pay estimates and change orders. Through comprehensive construction oversight and coordination, Bloom helped support the safe and efficient delivery of this complex bridge replacement project.