Kilbourn Avenue Bascule Bridge

Preserving a distinctive piece of Milwaukee's downtown infrastructure, the Kilbourn Avenue Bascule Bridge Rehabilitation modernized a historic movable bridge while maintaining its architectural and engineering character.

Location
Milwaukee, WI
Client
City of Milwaukee

Bloom provided project management, structural engineering, mechanical engineering, and construction-phase services for the $16.5 million rehabilitation of the double-leaf bascule bridge over the Milwaukee River.

Kilbourn Bascule Bride WEB 5

Awards

2010 Public Works Projects of the Year

APWA National

2010 Honorable Mention

Wisconsin Section APWA Awards Banquet

The project began with comprehensive inspections of the bridge's structural, mechanical, and electrical systems, followed by detailed rehabilitation design and construction documentation. Bloom also performed environmental investigations, including hazardous materials assessments and river sediment sampling, to address potential impacts from historic industrial activities.

Construction Cost
$16.5M
Kilbourn Bascule Bride WEB 2 2026 11 04 191926 uduw
Kilbourn Bascule Bride WEB 4

The rehabilitation improved bridge reliability, operational performance, and long-term durability while preserving its historic features. The project received national recognition from the American Public Works Association as a 2010 Public Works Project of the Year, demonstrating the successful integration of historic preservation and modern infrastructure engineering.

Year Completed
2008