Lake Bluff Drive Extension
Expanding local connectivity while incorporating sustainable infrastructure, the Lake Bluff Drive Extension project introduced approximately 1,575 linear feet of new roadway in the City of Oconomowoc.
- Location
- Oconomowoc, WI
- Client
- City of Oconomowoc
The improvements included asphalt pavement, curb and gutter, an asphalt trail, biofiltration systems, a precast three-sided box culvert, hydrant relocation, roadway signage, pavement markings, and site restoration. The culvert crossing of Rosenow Creek, a Class A trout stream, required close coordination with Wisconsin Department of Natural Resources (WDNR) representatives to address environmental considerations. High groundwater conditions also presented construction challenges, requiring continuous pumping and 24-hour monitoring.
Bloom provided construction administration and daily on-site inspection services, including contractor coordination, construction monitoring, and verification of compliance with project plans and specifications. The team also performed field data collection and surveying throughout construction to support the preparation of record drawings. Bloom's oversight helped deliver a durable roadway extension while addressing challenging site conditions and protecting sensitive natural resources.