Morse Road SWACO
Modernizing critical municipal infrastructure while maintaining uninterrupted operations, the Solid Waste Authority of Central Ohio's Morse Road facility redevelopment transformed an active waste management complex into a more efficient, integrated operations center.
- Location
- Columbus, OH
- Client
- Shaw Environmental Inc (CB&J) / SWACO
Bloom served as the primary engineer, providing structural and civil engineering services and coordinating mechanical, electrical, and plumbing design.
- SF Solid Waste Transfer Station
- 29,000
- SF Heated Vehicle Storage Facility
- 38,000
The project included a new 29,700-square-foot solid waste transfer station, an 18,400-square-foot vehicle maintenance facility, and a 38,800-square-foot heated storage building accommodating approximately 75 vehicles.
A carefully developed demolition and construction sequence allowed existing waste transfer and fleet operations to continue throughout redevelopment.
The design incorporated shared fueling and administrative facilities, improved vehicle circulation, and sustainable stormwater management strategies. The resulting campus enhances operational efficiency, environmental performance, and long-term infrastructure reliability.