USH 45/STH 100 Reconstruction
Modernizing a heavily traveled transportation corridor, the USH 45/STH 100 Reconstruction improved roadway safety, accessibility, and infrastructure performance along approximately one mile of six-lane urban highway in Franklin, Wisconsin.
- Location
- Franklin, WI
- Client
- WisDOT SE Region
The $12 million project included pavement reconstruction, upgraded storm sewer systems, a new stormwater detention pond, sidewalks, bicycle accommodations, traffic signal improvements, and new median lighting.
- Project Cost
- $12M
Bloom provided roadway engineering, project management, and design services, including traffic analysis, utility coordination, hydraulic analysis, ADA curb ramp design, and preparation of construction plans and specifications. The team developed detailed traffic staging strategies to maintain four lanes of traffic during construction while minimizing impacts to adjacent neighborhoods and businesses.
Through close coordination with WisDOT, Milwaukee County, the City of Franklin, and local stakeholders, Bloom delivered a comprehensive design focused on long-term mobility, safety, and community accessibility.