University of Wisconsin-Oshkosh: South Campus Parking Structure
Transforming a former industrial property into a functional and environmentally responsible campus asset, the UW–Oshkosh South Campus Parking Structure project combined transportation improvements, recreational facilities, and sustainable site development.
- Location
- Oshkosh, WI
- Client
- State of Wisconsin, DFD/DOA
Bloom served as prime consultant for the design of a three-level, 448-stall parking structure, eight new tennis courts, and supporting pedestrian and site improvements. The project required extensive coordination with the Wisconsin Department of Natural Resources to address historic site contamination and meet environmental and stormwater management requirements.
- Stalls
- 448
- Levels
- 3
Sustainable design strategies included pavement recycling, recycled construction materials, rain gardens, bioswales, stormwater infiltration, and energy-efficient lighting. By integrating infrastructure improvements with the University's campus master plan, Bloom helped create a more accessible, connected, and environmentally responsible campus environment.